Urgent procedures such as angioplasties, infusions , paracentesis and ERCPs being cancelled due to non-elective pathway pressures
We located a place in the hospital that could be converted into a protected daycase unit. We would increase the volume of patients per procedure list through utilising the same bed space throughout the day by reducing the recovery time
You can read the full presentation HERE